CHINESE LNG Distributor proposes LNG processing facility in TERRACE BC


A Chinese distributor of liquefied natural gas wants to build a processing facility near Terrace, next to the Northwest Regional Airport.Top Speed Energy (TSE) sent a letter to area residents near the site on Oct. 16, seeking feedback on a facility that could process 150,000 tonnes of LNG per year – about 0.6 per cent of what’s manufactured at LNG Canada’s multi-billion-dollar facility in nearby Kitimat.